Results & Resources
Explore our research outputs, tools, and real-world applications that are strengthening surveillance systems across Europe.
Deliverables
Project's website/webpages | D1.1 | WP1 DEC - Websites, patent filings, videos, etc
Lead: NPHO Due Date (month): 6 Level: PU - PublicThe project's dedicated website. Web pages dedicated to the project on the consortium's members' websites with relevant links and information on the project's activities, progress and achievements as agreed and outlined at the consortium agreement/partnership agreement. The main purpose will be to increase the action's visibility as well as the visibility and role(s) of the entities involved in its implementation.
Dissemination report | D1.2 | WP1 R - Document, report
Lead: UTH Due Date (month): 60 Level: PU - PublicA document outlining the dissemination actions and the timeline they will be implemented. The document will be conducted in English and the executive summary will also be available in Greek.
Existing Legal Framework and Data Exchange Protocols Report | D2.1 | WP2 R - Document, report
Lead: NPHO Due Date (month): 48 Level: SEN - SensitiveA report on landscape analysis of existing legal framework and agreements on data exchange and intersectoral collaboration protocols and following gaps identification details of newly established MoUs, legal framework and intersectoral data exchange protocols. The report will include GDPR requirements on intersectoral data exchange It will be conducted in Greek and an executive summary in Greek will also be English
Existing IT Infrastructure and Data Sources Report | D2.2 | WP1 R - Document, report
Lead: NKUA Due Date (month): 24 Level: SEN - SensitiveA report on existing laboratories IT infrastructure and data sources including gaps analysis The report will be describing the data model that will be developed for the integration of the various project data sources. This document will provide details on the syntax and the semantics of OHIM. This report will also describe the design and the functional features of the Data Lake and will provide the implementation details in terms of adopted technologies and software frameworks. The report will be conducted in English and the executive summary will also be available in Greek.
Integration report | D3.1 | WP3 R - Document, report
Lead: NKUA Due Date (month): 42 Level: SEN - SensitiveThis report will provide the implementation details of the Data Connectors and the activities that were followed to integrate data from various sectors into the Data Lake. The report will be conducted in English and an executive summary will also be available in Greek.
Pilot Programme Documentation | D3.2 | WP3 R - Document, report
Lead: NKUA Due Date (month): 48 Level: SEN - SensitiveReport on the Pilot Programme implementation activities that were carried out. The report will be conducted in English and an executive summary will be available in Greek.
Report on Existing Laboratory Capacities assessment, development of collaborative testing protocols and Quality assurance mechanisms | D4.1 | WP4 R - Document, report
Lead: NPHO Due Date (month): 18 Level: PU - PublicA report describing existing testing capacitty for all laboratories and capabilities on complementary testing. It will also describe the protocols for synergetic laboratory testing (collaborative testing protocols) and the quality assurance mechanisms to ensure quality and sustainability. The report will be conducted in Greek and an executive summary will also be available in English.
Surveillance Database Integration and Sharing | D5.1 | WP5 R - Document, report
Lead: NKUA Due Date (month): 60 Level: SEN - SensitiveA comprehensive report detailing the integration process, the digital platform's architecture, data sharing protocols, and the system's predictive modeling capabilities. The report will be conducted in English
Comprehensive guidelines for conducting risk assessments specific to ports and airports | D5.5 | WP5 R - Document, report
Lead: AUA Due Date (month): 60 Level: PU - PublicA comprehensive guide describing standardized surveillance, risk assessment, and response protocols for monitoring and managing invasive mosquito species, incorporating coordination mechanisms for alerts. These guidelines include a connection mapping process, leveraging data from the National Single Window (NSW), to track the movement of high-risk goods via cargo ships across international borders. The report will be conducted in English
Comprehensive guidelines for conducting risk assessments specific to airports | D5.3 | WP5 R - Document, report
Lead: BPI Due Date (month): 60 Level: PU - PublicA comprehensive guide describing standardized surveillance, risk assessment, and response protocols for monitoring and managing invasive mosquito species, incorporating coordination mechanisms for alerts. These guidelines include standardized disinsection protocols for aircraft to prevent the transport of invasive mosquito species via air travel. The report will be conducted in English.
Training Needs Assessment and FETP Curriculum Development Report | D6.1 | WP6 Other
Lead: NPHO Due Date (month): 12 Level: PU - PublicA report on landscape analysis and needs assessment on training related to surveillance and response and the academic curriculum, content and timetable of the Hellenic FETP. The document will be conducted in English.
Development of an e-learning platform for short-term training modules | D6.2 | WP6 R - Document, report
Lead: NPHO Due Date (month): 24 Level: PU - PublicA comprehensive guide describing standardized surveillance, risk assessment, and response protocols for monitoring and managing invasive mosquito species, incorporating coordination mechanisms for alerts. These guidelines include standardized disinsection protocols for aircraft to prevent the transport of invasive mosquito species via air travel. The report will be conducted in English.
Sustainability report | D7.1 | WP7 R - Document, report
Lead: NPHO Due Date (month): 60 Level: PU - PublicA detailed report on sustainability process of best practises and outcomes. The document will be conducted in English. An executive summary will also be available in Greek.
Evaluation report | D7.2 | WP7 R - Document, report
Lead: UTH Due Date (month): 60 Level: PU - PublicA detailed report comprising the findings of the evaluation for the duration of the project. It will include reporting on the progress (interim report) and completion of the Action-level indicators mandatorily requested in the project's call and the ones specifically identified for CSN. It will also include recommendations on sustainability and future directions. An interim evaluation report will also be conducted at M30 which will also serve as a checking point for the remaining duration of the project. The document will be conducted in English and the executive summary will also be available in Greek.
Publications & Reports
One Health Surveillance Networks: A European Perspective
PublishedEuropean Journal of Public Health • 2024 • CSN Consortium • DOI: 10.1093/eurpub/ckab123
ViewData and Tools
CSN Data Integration Platform
Software Tool Open SourceWeb-based platform for cross-sector data sharing and analysis.
Access ToolMosquito Surveillance Toolkit
Mobile App Public ReleaseMobile application for field surveillance and data collection.
Access ToolTraining Simulation Environment
Educational Platform Institutional AccessVirtual environment for epidemiology training and scenario-based learning.
Access ToolCase Studies & Success Stories
Aedes albopictus Detection Network - Greece
Athens Metropolitan Area 2023-2024Impact: Early detection of invasive mosquito populations across 15 monitoring stations.
Results: 30% improvement in response time, 25% reduction in population spread
Cross-Border Data Sharing Pilot
Greece-Bulgaria Border Region 2024Impact: Successful implementation of real-time data exchange protocols.
Results: Seamless information sharing between national surveillance systems.
FETP Training Program Launch
National Public Health Organization 2024-OngoingImpact: Enhanced capacity building for 50+ surveillance professionals.
Results: Improved outbreak response capabilities and international collaboration.
Educational Resources
Comprehensive training materials and educational content developed through our capacity building initiatives.
FETP Training Modules
Field epidemiology training curriculum in collaboration with ECDC.
Access MaterialsSurveillance Protocols
Step-by-step guides for implementing surveillance protocols.
Download GuidesWebinar Series
Recorded webinars covering key aspects of One Health surveillance.
Watch Videos